The Standard Navy Maintenance and Material Management (3M) System, commonly referred to as the "3-M System" is a revolutionary concept of management O currently being implemented in the active U.S.Navy Fleet. This System takes cognizance of and offers remedial solutions for the increasing complexity of equipment being introduced into the Fleet and the decreasing availability of skilled personnel to maintain them. Terms in this set (107)Students also viewedSets found in the same folderOther sets by this creatorVerified questionsRecommended textbook solutions
Other Quizlet setsUpgrade to remove ads Only A$47.99/year
Terms in this set (86)How often will the PMS check 4211/001 Q-6R have to be accomplished? Once per quarter or as required When is a caution tag used? To provide temporary special instruction as needed What are the responsibilities of the second person on an equipment tag-out procedure? Verify proper tag attachment and positioning of switch/valve Who reviews, and approves visa signature, the weekly PMS schedule? The division officer Who had overall responsibility for ensuring the 3M system functions within the command? The commanding officer Which document provides a listing of the MIP's assigned to a specific work center? (LOEP) List of Effective Pages Who is the ship's 3M Manager? The executive officer An MRC card with SYSCOM MRC control number A7 4ABG N has a production(birth) date of? October 2007 Which of the following is NOT the example of an IEM MRC? U-1 Which tag-out log would a supply department DCPO use to accomplish a DC related tag-out? Engineering tag-out log A classified maintenance requirement card is what color? Pink Which document provides instructions and references required for use in the 3M system? OPNAVIST 4790.4(series) If a question exists regarding a step in a maintenance requirement, the maintenance personnel should do what? Immediately contact the work center supervisor Where do maintenance personnel find their PMS assignments? Accountability log What is the purpose of the 3M system? Provide for a managing maintenance and material support that will ensure maximum equipment readiness Who may mark the weekly PMS schedule to indicate that the PMS check had been completed? Work center supervisor True or false: A maintenance person should immediately notify the work center supervisor when an MRC is not understood or seems correct. True Given the following information: [00883] Tester, 500V, 100MO, SCAT-4452 What number is used to locate the tester in the SPMIG? 00883 What is OPNAVIST 4790.4(series)? Ship's Maintenance and Material Management Manual Who is the 3-M system functional manager within the command? The 3-M Coordinator What form is used to report discrepancies/deficiencies in the PMS system? OPNAV 4790/7B (FBR) Who signs a DANGER tag first? The Authorizing Officer What is OPNAVINST 5100.19(series)? Safety Precautions for Forces Afloat True or false: The only requirements for DC Maintenance Person is to be DC qualified. False What is a MIP? Maintenance Index Page How often should PMS check 6641/005 M-9R be accomplished? Once a month or as required When would equipment be operated with a red tag attached? Never The Acronym 3M stands for what? Maintenance, Material and Management Danger Caution tag-out audits are conducted how often? Weekly On the MIP, MRC A-1 has a SYSCOM control number of 11 BWQD Y. what does the "Y" indicate? Repair parts are required What does a "C" beside the MIP number on the LOEP mean? A change to the MIP In SKED, M-1 (#R-1) signifies what? Monthly one has mandatory related maintenance of R-1 "S 24 DWYG N": Classified secret A MRC with a periodicity of 2M should be accomplished how often? Every second month When using HAZMAT, information of proper PPE can be found what 2 places? -in HMUG(Hazardous Materials User Guide) True or false: you can share an APL with another work center that also performs maintenance on the equipment covered by the APL. True The ship's 3-M system is designed to provide for managing maintenance and maintenance support to achieve _______ equipment operational readiness Maximum What symbol indicates mandatory maintenance is required and must be accomplished concurrently? # What 2 people may authorize Danger/Caution Tags? -EOOW/EDO For a Danger/Caution tag, when does the second person check the tags? After the first hangs the tags and hands the tagout sheet to the second person to find, check, and sign the tags What is chapter C1 in the Afloat Safety Manual (5100.19)? General safety What is chapter C9 in the Afloat Safety Manual (5100.19)? Electrical Safety What is chapter C18 in the Afloat Safety Manual (5100.19)? Painting and Preservation Safety What is chapter C23 in the Afloat Safety Manual (5100.19)? HAZMAT safety What does the word "CASREP" mean? Casualty Report What is a 5 digit code used to identify the manufacturer of a part? CAGE # true or false: The SPMIG in SKED provides NSN numbers for items required by PMS True What does MSDS stand for? Material Safety Data Sheet What is an MSDS for? -chemical contact and flashpoint of the HAZMAT The LOEP contain all except what? Tools required On the MRC card, man-hours refers to what? Total time not including the time required for tools and preparation, tag-out, remove and replace interference True or false: a PO2 can be the WCS True In the syscom control number 13 AWUX Y, the "Y" means what? Parts are required If a MIP has been added to your LOEP, how is it indicated on your LOEP? A Who holds the title of the maintenance manager? XO True or false. True What color is the danger tag? Red What color is the caution tag? Yellow What does a periodicity of "R" on the MRC card stand for?
A situational requirement What equipment tag out instruction is used onboard? TUMS (Tag-Out Users Manual) State the procedure in verifying a MRC against the work center PMS manual. MRC>MIP, MIP>LOEP,>LOEP> change page, check for current force revision What is the SPMIG? -Standard PMS Material Identification Guide What are the 3 conditions an item would be placed on IEM status? -inactive for it to be fixed APL Allowance Parts List When is a supplement form OPNAV 4790/2L used? When the work candidate's request needs a drawing to accomplish the maintenance What is FR? How often is it used? -force revision IEM Inactive Equipment Maintenance What's the date on this code? 10 4UML N -first two digits: month/year - January 2000 True or false. The allowance parts list contains a list of repair parts for a piece of equipment? True JSN Job Sequence Number 3 parts of the JCN? -Job Control Number An "out of commission" label on a gauge is what color? "Out of calibration "? Red; orange True or false: the maintenance person signs the accountability log after notifying the the WCS of the completion of maintenance. True LU -lay up When an MRC calls for a certain NEC for the maintenance person to perform the maintenance, can anyone else be assigned the maintenance? No What is the purpose of an FR? To distribute and implement PMS revisions, changes, or additions SYSCOM MRC Control Number 4 digit code located at lower right corner of MRC How many weeks worth of 13 week accountability logs are required to be maintained in the 13 week accountability file? 14; 13 previous weeks and the current week Who maintains the PMS master file? 3-M Coordinator What do these symbols mean? - ( ) - Convenient Related Maintenance How much time is required to complete a maintenance requirement that takes .4 man hours? 24 minutes True or false: An EGL (Equipment Guide List) should contain no more than 8 hours worth of work True SKED a computer based program TR uses to schedule, track, and assign PMS What sheet is signed by the maintenance person after the completion of maintenance? 13-week accountability log What does an asterisk followed by a periodicity code mean? Safety item/requires compliance with the OPNAV 4790.4 3 types of FBRs? -category A Students also viewedPMK-EE Professional Conduct (E4)80 terms DanielsStudy PMK-EE Warfighting and Readiness Exam for E4 Advan…35 terms Elizabeth_Chu5 PMK E4 Seamanship88 terms ArJuLunaPlus PMK EE E-4, E-4 Professional Conduct Exam57 terms kaylie_amber_dooner Sets found in the same folder3M77 terms Joseph_Liao BMR Assignment 943 terms navytboneguy NAVY ORM15 terms HMGuidera Hearing Conservation10 terms 13powellkPlus Other sets by this creatorSOY BOARDS19 terms nakei_d_williamsPlus SSES Pg. 711 terms nakei_d_williamsPlus INTEL pg.22 terms nakei_d_williamsPlus Intel pg.13 terms nakei_d_williamsPlus Verified questions
engineering Determine whether the following statements are true and give an explanation or counterexample. (a). For any equation containing the variables $x$ and $y$, the derivative $d y / d x$ can be found by first using algebra to rewrite the equation in the form $y=f(x)$. (b). For the equation of a circle of radius $r, x^2+y^2=r^2$, we have $\frac{d y}{d x}=-\frac{x}{y}$, for $y \neq 0$ and any real number $r>0$. ($c$). If $x=1$, then by implicit differentiation, $1=0$. (d). If $x y=1$, then $y^{\prime}=1 / x$. Verified answer
physics Suppose a disk rotates at constant angular velocity. $(b)$ If the disk's angular velocity increases uniformly. does the point have radial and/or tangential acceleration? Verified answer chemistry Draw structures for the following molecules. 1-butanol 2-butanol Verified answer
biology Express the function in the form $f \circ g.$ $v(t)=\sec \left(t^{2}\right) \tan \left(t^{2}\right)$ Verified answer Recommended textbook solutions
Chemistry for Engineering Students2nd EditionLawrence S. Brown, Thomas A. Holme 945 solutions Chemical Reaction Engineering3rd EditionOctave Levenspiel 228 solutions Introduction to Chemical Engineering Thermodynamics7th EditionHendrick Van Ness, J.M. Smith, Michael Abbott 590 solutions
Advanced Engineering Mathematics10th EditionErwin Kreyszig 4,134 solutions Other Quizlet setsExploration History Test23 terms haleykoh28 Chapter 19 part 511 terms apayne130 Marketing Lecture 935 terms racqueldavidson Speicmen collection and diagnostic techniques - vi…15 terms BTsmall What instruction is the 31. Purpose. To issue a revised Ships' Maintenance and Material Management (3-M) Manual which incorporates new and updated maintenance management policy. This instruction is a complete revision and should be reviewed in its entirety.
What instruction provides guidance for the implementation of policies for the maintenance and material management system?What instruction provides guidance for the implementation of policies for the maintenance and material management systems? JFMM volume VI chapter 19.
What appendix is in the Navseainst 4790.8 C?This appendix provides instruction on how to create and maintain Planned Maintenance System (PMS) schedules for commands using SKED 3.2.
What is the objective of the 3M system PMK EE?The 3M system provides for efficient, uniform methods of conducting and recording preventive and corrective maintenance.
|